Home > PRODUCTS > 1-Portal Frame Steel Buildings > Pre engineered Structural Steel Buildings for Supermarkets
  • Pre engineered Structural Steel Buildings for Supermarkets
  • Pre engineered Structural Steel Buildings for Supermarkets
  • Pre engineered Structural Steel Buildings for Supermarkets
  • Pre engineered Structural Steel Buildings for Supermarkets
  • Pre engineered Structural Steel Buildings for Supermarkets
Pre engineered Structural Steel Buildings for Supermarkets

Brand: WISBUILD

Product origin: Shandong, China

Delivery time: 30-40 days

Supply capacity: 6000 tons/month

If you are looking for the highest quality steel structure supplier, please contact us and our engineers will provide you with a professional quotation plan.

Pre engineered Structural Steel Buildings for Supermarkets

1 Structural Steel Buildings for Supermarkets Specification:

Items Specification
Main Steel Frame Column Q235, Q355,Q390 Welded H Section Steel
Beam Q235, Q355,Q390 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system Roof Panel EPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall Panel Sandwich Panel / Corrugated Steel Sheet
Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
Door Sliding Sandwich Panel Door / Rolling Metal Door
Rainspout PVC
Live load on Roof In 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and textures available
Paint Options Alkyd paiting, two primary painting, two finish painting
(Primer ,Medium paint ,top coat, epoxy zinc etc.) Or Galvanized.

2 Steel Structure Production Lines:

Steel Structure Production Lines

As a highly automated steel fabrication facility and leading provider of structural steel buildings, state-of-the-art machinery enables efficient, precision manufacturing to exacting standards. The expansive indoor production plant houses advanced beam drilling lines, fully-automated welding systems with real-time quality control, precision cutting machines, robotic pick-and-pack stations plus an intelligent shot blasting line integrated with inventory tracking software. These heavy-duty CNC machines provide accuracy down to a fraction of a millimeter for cutting I-beams, channels, angles and plates of varying specifications. Complemented by overhead electric cranes, hydraulic lifts and conveyors, the end-to-end steel processing and handling equipment also enables safe, streamlined material flows. With quality machinery matched to rigorous production protocols and experienced technical staff, exceptional structural steel projects can be delivered on-time meeting exact client specifications.

3 Details of Purlin Installation:

Purlin installation details

Steel deck flooring utilizes integrated cold-formed galvanized steel sheets interlocked to concrete slabs. The unique system combines lightweight yet high-strength steel decking panels in ribs with structural concrete topping. This enables rapid construction of robust flooring that meets demanding capacity, durability and fire safety standards. Various profile options allow long institute-free spans with fewer beams. Factory integrated is reliable subfloor ventilation. Our innovative designs accommodate electrical and mechanical systems within the structural decking. With expertise in efficient fabrication and just-in-time delivery, we provide clients value engineered floor solutions customizable to specialized applications.

4 Pre engineered Structural Steel Buildings for Supermarkets Project Cases:

Pre engineered Structural Steel Buildings for Supermarkets Project Cases

As a leading manufacturer of pre-engineered steel buildings, our expertise in designing and constructing high-quality prefab workshops has delivered proven solutions for diverse industrial projects. With efficient integrated production, we expertly fabricate steel frameworks, wall systems, and roofing components under quality controlled settings for rapid on-site assembly. Our tailor-made solutions feature modular expandable designs, increased height capabilities to accommodate overhead cranes, high load-bearing capacity flooring, and custom mezzanine options. We recently completed a 2,000 sqm machinery workshop featuring a 15m haunch height, integrated office space and a 20-ton bridge crane system. Additionally, we partnered with a shipping facility to erect a large vehicle maintenance hangar designed fordurability and corrosion resistance. As a reliable long-term partner, we provideclients exceptional value through innovative steel structure systems purpose-built for specialized workshop requirements.

5 Steel Structure Prefabricated Workshops Q&As:

Q: Are there any specific design requirements for the steel building?
A: While there are no strict design requirements, providing us with any specific preferences or requirements for the building’s aesthetics, layout, or functionality can help us tailor the design to better suit your needs.

Q: What is the typical lead time for the production of customized steel buildings?
A: The lead time varies depending on the complexity and size of the project. Generally, it takes approximately 4 to 8 weeks from the confirmation of the design to the completion of manufacturing.

Q: Can additional features such as windows and doors be added later after the steel building is installed?
A: Yes, additional features like windows, doors, or other modifications can be added after the initial installation. However, it’s advisable to discuss such modifications during the initial design phase to ensure proper integration.

Q: Is there a warranty for the customized steel buildings?
A: Yes, we provide a warranty for our steel buildings. The specific terms and duration of the warranty will be outlined in the contract and documentation provided upon purchase.

Q: How do you handle the logistics and shipping of the steel building components?
A: We work with reliable logistics partners to ensure the safe and timely delivery of the steel building components. The shipping process, including tracking information, will be communicated to you once the components are dispatched.

 

Related Products
Product Tag